PPT Slide
Previous slide
Next slide
Back to first slide
View graphic version
Notes:
EACH CENTER HAD MULTIPLE CONSOLES, ENOUGH TO COVER ALL THE RADAR DEVICES THEN OPERATING
EACH OPERATOR SHIFT WAS SIX HOURS